综合一区欧美国产,99国产麻豆免费精品,九九精品黄色录像,亚洲激情青青草,久久亚洲熟妇熟,中文字幕av在线播放,国产一区二区卡,九九久久国产精品,久久精品视频免费

Global EditionASIA 中文雙語Fran?ais
China
Home / China / Society

Main structure of Beijing metro Line 12 to be completed in 2019

Xinhua | Updated: 2018-02-03 22:32
Share
Share - WeChat

BEIJING -- The main structure of metro line 12, which will run east and west through northern Beijing, will be finished by 2019, the Beijing Municipal Commission of Transport said on Saturday.

The line, with a total length of 29.6 kilometers, will have 21 stops, 15 of which are transfer stations, the commission said. About 60 percent of construction work has begun, and the main structure will be finished by the end of 2019, the commission said.

The line is expected to become operational in 2021. It will start at Sijiqing Bridge near the west fourth ring road and end in the Dongba area near the east fifth ring road in Chaoyang district.

Beijing has taken measures to ease traffic congestion in the city by building subway lines.

By the end of 2017, the city's metro system measured 608 kilometers. By the end of 2018, the system will be extended to 630 kilometers. Beijing now has 22 metro lines.

Top
BACK TO THE TOP
English
Copyright 1994 - . All rights reserved. The content (including but not limited to text, photo, multimedia information, etc) published in this site belongs to China Daily Information Co (CDIC). Without written authorization from CDIC, such content shall not be republished or used in any form. Note: Browsers with 1024*768 or higher resolution are suggested for this site.
License for publishing multimedia online 0108263

Registration Number: 130349
FOLLOW US
 
甘孜| 台湾省| 麻城市| 会泽县| 高雄县| 中阳县| 外汇| 鹰潭市| 额敏县| 兰溪市| 伊宁市| 垦利县| 泗洪县| 福泉市| 墨脱县| 美姑县| 石楼县| 蓬溪县| 光泽县| 桦川县| 安康市| 安义县| 南宫市| 明星| 阜新| 德钦县| 徐水县| 华容县| 昌黎县| 濮阳市| 河北区| 海兴县| 江安县| 图片| 卓资县| 忻城县| 太和县| 加查县| 商城县| 名山县| 蕉岭县|