综合一区欧美国产,99国产麻豆免费精品,九九精品黄色录像,亚洲激情青青草,久久亚洲熟妇熟,中文字幕av在线播放,国产一区二区卡,九九久久国产精品,久久精品视频免费

Global EditionASIA 中文雙語Fran?ais
China
Home / China / Society

Work on intercity railway linking Beijing and Xiongan New Area begins

By Zhang Yi in Xiongan, Hebei | chinadaily.com.cn | Updated: 2018-02-28 11:40
Share
Share - WeChat

The line begins from Liying Railway Station in Beijing, passing through the capital's new airport in Daxing district and Hebei's Bazhou, and terminates at Xiongan Railway Station.

With an investment of 33.53 billion yuan, the railway has an overall length of 92.4 kilometers, with five stations along the line.

It will allow high-speed trains to run with a design speed of 350 kilometers per hour in the section from the new airport to Xiongan when it is put in use in 2020.

The section between Liying and the new airport will be put into use in September 2019 when the new airport is expected to open to traffic, with a design speed of 250 km/h.

After the new railway line comes into service, the travel time from Xiongan New Area to Beijing will be 30 minutes.

The construction of an intercity railway between Beijing and Xiongan New Area in Hebei province kicked off in Xiongan on Wednesday. [Zhang Yi / China Daily]
1 2 3 Next   >>|
Top
BACK TO THE TOP
English
Copyright 1994 - . All rights reserved. The content (including but not limited to text, photo, multimedia information, etc) published in this site belongs to China Daily Information Co (CDIC). Without written authorization from CDIC, such content shall not be republished or used in any form. Note: Browsers with 1024*768 or higher resolution are suggested for this site.
License for publishing multimedia online 0108263

Registration Number: 130349
FOLLOW US
 
汉沽区| 波密县| 贵溪市| 河东区| 青龙| 沙湾县| 龙门县| 方城县| 方城县| 紫云| 小金县| 黄龙县| 蒲城县| 泾阳县| 筠连县| 即墨市| 德保县| 洛浦县| 曲水县| 广宗县| 仙游县| 金川县| 浪卡子县| 彩票| 荆门市| 防城港市| 荥阳市| 江川县| 二连浩特市| 乌拉特后旗| 中江县| 湾仔区| 榆林市| 巴彦淖尔市| 漾濞| 新疆| 二连浩特市| 永年县| 全州县| 正镶白旗| 海安县|