综合一区欧美国产,99国产麻豆免费精品,九九精品黄色录像,亚洲激情青青草,久久亚洲熟妇熟,中文字幕av在线播放,国产一区二区卡,九九久久国产精品,久久精品视频免费

Global EditionASIA 中文雙語Fran?ais
China
Home / China / Newsmaker

Chief engineer hails 'compelling success'

By He Shusi and Luis Liu | China Daily | Updated: 2018-10-23 10:37
Share
Share - WeChat
The bridge seen during construction in November 2017. ROY LIU/CHINA DAILY

Substantial progress

After 40 years of reform and opening-up, China has made great progress in engineering, materials manufacture and technical expertise. Many outstanding engineers have come to the fore during the process, Su said.

"Now we build our projects not only based on the need for transportation, but also to meet the demand for high-quality, long-lasting, aesthetically pleasing projects that are easy to maintain, he said.

There were difficulties, of course, and when some contractors asked Su to lower the standards, he refused. He has never regretted his decision.

"With previous failures in mind, the team members (of the HZMB) had their ambitions bottled up, and they were determined to build something to restore the reputation of Chinese engineering," he said.

Even with the world's leading technologies at their disposal, Su and his team faced unknown factors while building the world's longest bridge-island-tunnel complex.

The 6.7-km subsea tunnel alone is China's first-ever offshore immersed tunnel - the longest in the world for vehicular traffic. The construction team had to work with limited data about the Pearl River estuary, because there had been no marine work in the area prior to the HZMB project.

Asked how many experiments the team had undertaken to assess factors such as resistance to wind and water pressure, and earthquakes, Su reviewed 14 years of preparatory work and construction.

"Conservatively, at least 300," he said, adding that usually just a couple of dozen experiments are necessary to build a sea crossing in China.

"To build the HZMB, we carried out the highest number of experiments in the nation's bridge-building history, which is a remarkable feat in terms of global engineering."

He praised the role Hong Kong played in the construction process.

"Hong Kong's international ties and close relationship with the mainland helped us to integrate global resources to achieve something great in the HZMB project," he said.

Taking the project as a whole, he is confident that the bridge will be an unrivaled success and will not disappoint expectations.

However, he cautioned China's engineers not to become complacent, because the country still faces many developmental challenges. One or two world-class bridges can serve as models, he said, but fundamental improvement will rely on the country's progress in overall economic and industrial development.

|<< Previous 1 2 3 4 Next   >>|
Top
BACK TO THE TOP
English
Copyright 1994 - . All rights reserved. The content (including but not limited to text, photo, multimedia information, etc) published in this site belongs to China Daily Information Co (CDIC). Without written authorization from CDIC, such content shall not be republished or used in any form. Note: Browsers with 1024*768 or higher resolution are suggested for this site.
License for publishing multimedia online 0108263

Registration Number: 130349
FOLLOW US
 
北流市| 大方县| 抚松县| 若尔盖县| 津南区| 榆林市| 呼伦贝尔市| 库伦旗| 平潭县| 玛多县| 华容县| 依兰县| 马尔康县| 泉州市| 灌阳县| 邢台县| 长泰县| 成都市| 略阳县| 故城县| 泰州市| 平潭县| 咸丰县| 衡阳市| 永仁县| 鲁甸县| 平昌县| 保山市| 阿坝县| 阳西县| 政和县| 芜湖市| 崇礼县| 贵德县| 陆良县| 金寨县| 吴旗县| 开封市| 昭苏县| 凤台县| 交城县|