综合一区欧美国产,99国产麻豆免费精品,九九精品黄色录像,亚洲激情青青草,久久亚洲熟妇熟,中文字幕av在线播放,国产一区二区卡,九九久久国产精品,久久精品视频免费

Global EditionASIA 中文雙語Fran?ais
China
Home / China / Environment

Coastline to provide natural storm defense

By Chen Zimo | China Daily | Updated: 2019-03-18 09:53
Share
Share - WeChat
A major landscape development under construction along the Tianmu River, the main watercourse through the new district of Hengqin in Zhuhai, Guangdong province, in December.Provided To China Daily

Authorities plan to use the existing environment to ensure improved protection from typhoons in the Greater Bay Area. Chen Zimo reports from Hong Kong.

Coastal areas across the Guangdong-Hong Kong-Macao Greater Bay Area are to be fortified against "once-in-a-century typhoons", which, despite the name, seem to be arriving more frequently.

Super typhoons have become a plague along the coasts of Hong Kong and Guangdong province, prompting governments to preserve and recreate natural seashores.

References to Typhoon Hato (2017) and last year's Typhoon Mangkhut prompt painful recollections of catastrophic winds and storm surges - one indelibly imprinted image is of a storm surge, five stories high, smashing into Heng Fa Chuen, a private housing complex in Chai Wan in the east of Hong Kong Island.

The complex, on land reclaimed from a pebble beach, was developed in the 1970s by the Mass Transit Railway Corp and was connected to the MTR's undersea tunnel nearby.

From the beginning, there were reports of severe flooding during extreme weather. Heng Fa Chuen, on the frontline of the typhoon track, suffered heavy damage every time a major storm struck. Among the most notable events were Typhoon Nesat in 2011 and Typhoon Hagupit in 2008.

In November, two months after Mangkhut struck, the Hong Kong Special Administrative Region government promised to commission a study of low-lying coastal areas and other districts vulnerable to high winds to assess the impact of wind and waves.

The city's Civil Engineering and Development Department is arranging funding and choosing consultants for the work, which is expected to begin soon and should be completed late next year.

However, Heng Fa Chuen and other low-lying areas will have to wait at least two years before a solution becomes evident.

One expert urged the government to move faster. Piet Dircke, a specialist in the field of flood protection, said there is a time limit for undoing the damage following a disaster.

"After a flood, I usually tell city authorities 'you now have five years to move fast and make decisions'," he said, noting that within that time frame related images remain etched in public consciousness and demand for relief remains high.

After that, memories fade, so when large restoration and protection projects are proposed, people begin to think, "It wasn't so bad. Do we really need all of this?".

Dircke added that constructing and rebuilding waterfront barriers takes considerable time, especially when land must be reclaimed. In addition, there are high costs to consider. "You don't talk in years, but in decades," he said.

1 2 3 Next   >>|
Top
BACK TO THE TOP
English
Copyright 1994 - . All rights reserved. The content (including but not limited to text, photo, multimedia information, etc) published in this site belongs to China Daily Information Co (CDIC). Without written authorization from CDIC, such content shall not be republished or used in any form. Note: Browsers with 1024*768 or higher resolution are suggested for this site.
License for publishing multimedia online 0108263

Registration Number: 130349
FOLLOW US
 
呼伦贝尔市| 祁阳县| 封开县| 新巴尔虎右旗| 福鼎市| 沙坪坝区| 桑植县| 潮安县| 靖安县| 专栏| 曲周县| 阳新县| 翼城县| 眉山市| 古丈县| 白河县| 搜索| 延庆县| 西青区| 屏东县| 尉犁县| 临城县| 彭阳县| 双峰县| 阿荣旗| 剑阁县| 孟州市| 综艺| 确山县| 元朗区| 东阳市| 三都| 汤原县| 资中县| 拜城县| 岐山县| 曲靖市| 蓝田县| 平阴县| 油尖旺区| 合川市|