综合一区欧美国产,99国产麻豆免费精品,九九精品黄色录像,亚洲激情青青草,久久亚洲熟妇熟,中文字幕av在线播放,国产一区二区卡,九九久久国产精品,久久精品视频免费

Global EditionASIA 中文雙語Fran?ais
China
Home / China / Innovation

Cold functional test starts at China's first Hualong One nuclear project

Xinhua | Updated: 2019-04-27 20:13
Share
Share - WeChat

FUZHOU -- Cold functional tests began Saturday on a reactor of China's first nuclear power project using Hualong One technology, a domestically developed third-generation reactor design.

The test was conducted on a circuit of the No. 5 nuclear power unit in the city of Fuqing, eastern China's Fujian Province, to evaluate the performance of the circuit system and its supporting facilities under high-pressure conditions, according to the China National Nuclear Corporation (CNNC).

The CNNC said the test started 50 days ahead of schedule.

Hualong One reactors were jointly designed by two nuclear power giants, China General Nuclear Power Group and the CNNC, and passed inspection by a national panel in August 2014.

China has since approved the use of Hualong One technology to build two reactors in Fujian, the No. 5 and No. 6 units.

Top
BACK TO THE TOP
English
Copyright 1994 - . All rights reserved. The content (including but not limited to text, photo, multimedia information, etc) published in this site belongs to China Daily Information Co (CDIC). Without written authorization from CDIC, such content shall not be republished or used in any form. Note: Browsers with 1024*768 or higher resolution are suggested for this site.
License for publishing multimedia online 0108263

Registration Number: 130349
FOLLOW US
 
哈密市| 柳江县| 若尔盖县| 贺州市| 志丹县| 南川市| 武安市| 修水县| 海晏县| 韶关市| 盐源县| 高密市| 旺苍县| 石嘴山市| 郑州市| 靖边县| 新巴尔虎右旗| 昌宁县| 隆安县| 青浦区| 牡丹江市| 香格里拉县| 尼勒克县| 嘉鱼县| 道孚县| 岚皋县| 睢宁县| 富阳市| 南溪县| 荔浦县| 邯郸县| 自贡市| 横峰县| 永胜县| 中阳县| 湖北省| 石河子市| 哈密市| 上蔡县| 比如县| 九龙城区|