综合一区欧美国产,99国产麻豆免费精品,九九精品黄色录像,亚洲激情青青草,久久亚洲熟妇熟,中文字幕av在线播放,国产一区二区卡,九九久久国产精品,久久精品视频免费

Global EditionASIA 中文雙語Fran?ais
China
Home / China / Society

Team to examine options for plateau water project

By Hou Liqiang | China Daily | Updated: 2020-04-21 09:35
Share
Share - WeChat
An aerial view of the Danjiangkou Dam in Hubei province. The reservoir is the start of the middle route of the South-North Water Diversion Project. [Photo provided to CHINA DAILY]

The country is expected to conclude a report by the end of this year examining options for the western route of the South-to-North Water Diversion Project.

The report will compare options for the route across the Qinghai-Tibet Plateau, sending water from the Yangtze River, the country's longest, to the Yellow River, the second longest, according to the Yellow River Conservancy Commission.

To finalize the report, an 18-member team left Zhengzhou, Henan province, on Friday for a 20-day "comprehensive survey" to study an option to take water from two locations in Sichuan province.

With the Lianghekou section of the Yalong River and the Shuangjiangkou section of the Dadu River as water sources, the option proposes to end the western route in the Taohe River, a tributary of the Yellow River in Gansu province, according to the commission.

The team, which boasts expertise in geology, exploration and engineering design, will visit the proposed sites for tunnels and main buildings. Major geological structures along the proposed route will also be inspected, it said.

Since the first survey in 1952, achievements have been made in research and examination over the western route, "a strategic water resource allocation project that will support ecological and environmental protection and high quality development in the Yellow River basin", the commission said.

Initiated as early as the 1950s, the South-to-North Water Diversion Project consists of three planned routes. While the eastern route was put into operation in 2013 and the middle route in 2014, construction has not yet begun on the western route.

In November, while presiding over a work meeting on follow-up efforts in the South-to-North project, Premier Li Keqiang called for more effort to push forward the project and other key water conservancy projects to address uneven distribution of water resources, while tapping their potential in stabilizing economic growth and creating jobs.

In addition to asking to push the follow-up construction of the eastern and middle routes at an appropriate time, Li also urged that an examination of the options for the western route be carried out.

Top
BACK TO THE TOP
English
Copyright 1994 - . All rights reserved. The content (including but not limited to text, photo, multimedia information, etc) published in this site belongs to China Daily Information Co (CDIC). Without written authorization from CDIC, such content shall not be republished or used in any form. Note: Browsers with 1024*768 or higher resolution are suggested for this site.
License for publishing multimedia online 0108263

Registration Number: 130349
FOLLOW US
 
汝南县| 苗栗市| 柏乡县| 隆回县| 舞阳县| 潍坊市| 德化县| 阿坝| 小金县| 鹿泉市| 凌源市| 屏东县| 乌拉特中旗| 长乐市| 青龙| 厦门市| 临清市| 高唐县| 德保县| 临邑县| 杭锦后旗| 南通市| 伊宁县| 措勤县| 郑州市| 怀宁县| 亚东县| 香格里拉县| 溧阳市| 宾川县| 柳林县| 昭平县| 武城县| 石城县| 长治市| 射阳县| 肃宁县| 绵竹市| 马关县| 南平市| 新兴县|