综合一区欧美国产,99国产麻豆免费精品,九九精品黄色录像,亚洲激情青青草,久久亚洲熟妇熟,中文字幕av在线播放,国产一区二区卡,九九久久国产精品,久久精品视频免费

Global EditionASIA 中文雙語Fran?ais
World
Home / World / Europe

Laying of last pipe of Nord Stream 2 pipeline completes

Xinhua | Updated: 2021-09-07 09:59
Share
Share - WeChat
This picture posted on the website of Russian energy giant Gazprom shows Nord Stream 2 pipe-laying operations in German territorial waters.

MOSCOW - The last pipe of the two strings of the Nord Stream 2 pipeline was welded, Nord Stream 2 AG, the operating company, said in a press release Monday.

"On September 6, 2021, specialists on the laybarge Fortuna welded the last pipe of the two strings of the Nord Stream 2 Pipeline," the company said.

"As the next step, the section of the pipe coming from the German shore will be connected to the section coming from the Danish waters in a so-called above water tie-in," it added.

The company intends to put the Nord Stream 2 gas pipeline into operation before the end of the year. It said the project will ensure gas supply security and reliability, and "contribute to meeting long-term needs of the European energy market for gas imports."

The 1,230-km gas pipeline would bring 55 billion cubic meters of gas annually from Russia to Germany through the Baltic Sea.

Most Viewed in 24 Hours
Top
BACK TO THE TOP
English
Copyright 1994 - . All rights reserved. The content (including but not limited to text, photo, multimedia information, etc) published in this site belongs to China Daily Information Co (CDIC). Without written authorization from CDIC, such content shall not be republished or used in any form. Note: Browsers with 1024*768 or higher resolution are suggested for this site.
License for publishing multimedia online 0108263

Registration Number: 130349
FOLLOW US
汽车| 昌平区| 北流市| 海门市| 社旗县| 汤原县| 漠河县| 迁西县| 锦屏县| 武宁县| 海晏县| 灵宝市| 册亨县| 连云港市| 万盛区| 阿图什市| 舒兰市| 德州市| 云梦县| 监利县| 浠水县| 桂阳县| 宜阳县| 天峨县| 临清市| 龙海市| 曲周县| 武清区| 永胜县| 嘉鱼县| 瑞安市| 伊宁市| 左贡县| 淅川县| 静乐县| 邵东县| 三原县| 丽水市| 申扎县| 同德县| 图片|