综合一区欧美国产,99国产麻豆免费精品,九九精品黄色录像,亚洲激情青青草,久久亚洲熟妇熟,中文字幕av在线播放,国产一区二区卡,九九久久国产精品,久久精品视频免费

Business / Industries

Passenger transport starts on Tibet's new railway

(Xinhua) Updated: 2014-08-18 13:12

Passenger transport starts on Tibet's new railway

The first passenger train from Lhasa to Xigaze heads into Xigaze Railway Station, Southwest China's Tibet autonomous region, Aug 16, 2014. [Photo/Xinhua]

LHASA - Passenger transport service started Saturday on the newly opened Lhasa-Xigaze railway, the second rail line in southwest China's Tibet autonomous region.

Train K9821 left the Lhasa railway station at 9 am Saturday and arrived at the Xigaze station at 11:59 am. It made four stops along the way.

"Tickets went on sale yesterday for the first train. Today, 828 passengers took the train, or an occupancy rate of 99 percent," said Zhao Hailin, deputy head of the Lhasa railway station.

The 251-km railway links the regional capital of Lhasa with Xigaze, Tibet's second-largest city and the traditional seat of the Panchen Lama. It began construction in 2010 at a cost of 13.28 billion yuan ($2.16 billion) and officially opened Friday.

The railway has a total of 14 stops including Lhasa and Xigaze. It has a designed transport capacity of 8.3 million tons of freight annually and allows trains to travel at a minimum speed of 120 km per hour.

"We plan to pay a visit to the famous Tashilhunpo Monastery in Xigaze and return to Lhasa in the afternoon by train," said a tourist surnamed Le, who was accompanied by her parents on the train. They came from the southeastern coastal province of Fujian.

Le said when she learned about the opening of the Lhasa-Xigaze railway on TV, she went to the Lhasa station at around 5 am Friday to buy tickets.

"We are very lucky to take the first train," said Wangdui, a Tibetan resident in Lhasa. "It is safe and comfortable."

Wang said it used to take a long time to travel between the two cities, but now it takes just three hours by train.

Train K9822 leaves Xigaze at 5:30 pm and arrives in Lhasa at 8:27 pm.

The Lhasa-Xigaze railway is the first extension of the 1956-km Qinghai-Tibet railway, which began operation in 2006. The Qinghai-Tibet railway is the world's highest, built at an elevation of more than 5,000 meters above sea level.

Passenger transport starts on Tibet's new railway Passenger transport starts on Tibet's new railway
Tibet's second railway line opens
Xi stresses better transport for Tibet 

Previous Page 1 2 3 Next Page

Hot Topics

Editor's Picks
...
...
栾城县| 连江县| 安岳县| 灵川县| 安塞县| 云梦县| 高州市| 铁力市| 阿克陶县| 宝应县| 柳州市| 武汉市| 临高县| 兴国县| 镇江市| 米泉市| 德州市| 丹江口市| 巢湖市| 九江市| 崇阳县| 昭通市| 敖汉旗| 朝阳市| 永登县| 阳原县| 杭锦后旗| 正阳县| 高陵县| 双牌县| 汉中市| 西藏| 华坪县| 高邑县| 尚义县| 岗巴县| 尤溪县| 黄龙县| 河津市| 金乡县| 鹿泉市|