综合一区欧美国产,99国产麻豆免费精品,九九精品黄色录像,亚洲激情青青草,久久亚洲熟妇熟,中文字幕av在线播放,国产一区二区卡,九九久久国产精品,久久精品视频免费

   

Work could start on Xinjiang railways - NDRC

By Chen Jia (China Daily)
Updated: 2008-02-13 07:05

Construction could start this year on three railways in the Xinjiang Uygur autonomous region, sources with the National Development and Reform Commission (NDRC) said Tuesday.

Related readings:

 Passenger wave hits East China railway, highway
 Beijing-Guangzhou railway back in use
 China shifts railway capacity to coal transport
 China Exim Bank to finance railway project in Mauritania

The NDRC plans to invest 4.25 billion yuan ($591 million) in the three railways: the Lanxin, Nanjiang and Kuitun railways.

It has also been reported that work on the Jingyihuo Railway, the first electric railway in Xinjiang, has accelerated and should be complete by the end of this year, according to Chinanews.com.

Experts say developing Xinjiang's rail capacity will make it easier to exploit its massive stores of energy resources.

With estimated reserves of 20.8 billion tons of oil and 10.8 trillion cu m of gas, Xinjiang is seen as a strategic complement to Heilongjiang, China's top natural gas and oil producer this year.

The latest data from four major northwestern oil and gas bases revealed that Xinjiang had produced 26.4 million tons of crude oil and 21.2 billion cu m of gas last year, or 43.3 million tons of oil equivalent.

The latter figure represented a rise of 13.6 percent from 2006.

The plan to build more railroads in Xinjiang will facilitate the growing trade between western China and central Asia and open up the southern passage of the new Euroasia continental bridge.

Currently the only railway linking Xinjiang with central Asia is a 460-km line between Urumqi and Alataw Pass, where it connects to Kazakhstan railways.

It has been reported that the construction of two railways linking Xinjiang with the central Asian nations of Kyrgyzstan, Uzbekistan and Kazakhstan is under way.

The 6.2-billion yuan railway linking Korgas on the China-Kazakhstan border with China's inland railways, is expected to be completed within this year.

It will extend westward to join the Sary-Ozek railway of Kazakhstan to become the second cross-border rail link between the two countries.

Meanwhile, preparatory work has begun on the China-Kyrgyzstan-Uzbekistan Railway, which starts from Kashi in Xinjiang and extends through Kyrgyzstan to Uzbekistan.


(For more biz stories, please visit Industry Updates)



霞浦县| 岗巴县| 德钦县| 武汉市| 盐亭县| 郁南县| 内黄县| 南昌市| 桦南县| 类乌齐县| 甘孜县| 青岛市| 渝中区| 甘洛县| 铁岭市| 银川市| 宿州市| 桂阳县| 万全县| 九江县| 平果县| 西贡区| 乌鲁木齐市| 阳西县| 安多县| 永清县| 滨海县| 伊春市| 牙克石市| 绥宁县| 滨州市| 济宁市| 浦东新区| 乌兰察布市| 衡东县| 莲花县| 格尔木市| 长岛县| 比如县| 呼伦贝尔市| 舟曲县|