综合一区欧美国产,99国产麻豆免费精品,九九精品黄色录像,亚洲激情青青草,久久亚洲熟妇熟,中文字幕av在线播放,国产一区二区卡,九九久久国产精品,久久精品视频免费

   

Three Gorges Project to begin full operation this year

(Xinhua)
Updated: 2008-02-20 00:01

YICHANG - The Three Gorges Project will start full-scale operation this year, its developer announced on Tuesday.

The Three Gorges Project is seen in this file photo taken in Yichang, Central China's Hubei Province, May 22, 2007. [Xinhua] 

Addressing an ongoing corporate work conference in Hubei Province, Li Yong'an, China Three Gorges Project Corporation (CTGPC) general manager, said principal work would be completed in late 2008, one year ahead of schedule.

He said workers had finished all transmission facilities and would fully complete the relocation task before the summer flood season starts on the Yangtze River. They have been installing a ship lift and the final five turbogenerators, all of which are on the river's southern bank.

The Three Gorges, which consist of the Qutang, Wuxia and Xiling gorges, extends for about 200 kilometers on the upper and middle reaches of the river. They are a popular tourist destination, known for their natural beauty and historical and cultural relics.

China launched the Three Gorges Project, a multifunction water control facility, in 1993, with a budget of US$22.5 billion.

According to the original plan, the project requires the construction of key facilities, including a gigantic dam, a five-tier lock, a ship lift and 26 turbo-generators. It has involved the relocation of at least 1.2 million residents.

The 26 turbogenerators -- 14 on the northern bank and 12 on the southern bank -- have a designed annual capacity of 84.7 billion kilowatt hours of electricity.

The project is intended to reduce the threat of floods on the Yangtze from once every 10 years to once every 100 years.

To date, workers have completed installation of 21 generators on both banks of the Yangtze, according to Li.

Last year, CTGPC generated 77.07 billion kwh of electricity and recorded 12.94 billion yuan (about US$1.77 billion) in profit, 78 percent more than the targeted profit. It plans to generate 88.15 billion kwh of hydropower this year, with a profit target of 12.46 billion yuan.

   1 2   


Top China News  
Today's Top News  
Most Commented/Read Stories in 48 Hours
宿州市| 延长县| 博客| 海盐县| 聂拉木县| 喜德县| 岑溪市| 财经| 汝州市| 丽江市| 湟中县| 昌江| 从江县| 安仁县| 天水市| 惠安县| 高安市| 新津县| 通河县| 剑阁县| 临猗县| 北海市| 金昌市| 亚东县| 六枝特区| 溧水县| 怀来县| 大余县| 阿荣旗| 临城县| 平泉县| 普定县| 于田县| 南郑县| 木兰县| 金湖县| 无棣县| 鄂伦春自治旗| 南岸区| 石门县| 保德县|