综合一区欧美国产,99国产麻豆免费精品,九九精品黄色录像,亚洲激情青青草,久久亚洲熟妇熟,中文字幕av在线播放,国产一区二区卡,九九久久国产精品,久久精品视频免费

  .contact us |.about us
Home BizChina Newsphoto Cartoon LanguageTips Metrolife DragonKids SMS Edu
news... ...
             Focus on... ...
   

Qinghai-Tibet railway pollution-free: survey
( 2002-09-30 11:30 ) (8 )

A survey shows the construction of the Qinghai-Tibet railway has not polluted the source of the Yangtze River, which is in the project area.

According to a water quality and environment survey by the Qinghai Provincial Environment Monitoring Center, the water quality at the source of the Yangtze, the longest river in China, has remained unchanged.

The center has regularly monitored and tested water quality in the area since the railway project began in June last year.

The Qinghai-Tibet railway, running for 1,142 km from Golmud in Qinghai Province to Lhasa in the Tibet Autonomous Region, is the longest and most elevated railway built on highlands in the world.It will be the first railway linking Tibet with the rest of China.   

A total of 960 km of the railway will be laid in area with an elevation of more than 4,000 meters.

Workers with the Qinghai Provincial Environment Monitoring Center tested 15 items, including heavy metals, suspended substances and biochemical oxygen consumption in the water in the upper and lower reaches of the Yangtze River and its tributaries.

They also monitored the water quality of the Golmud, Sancha andXueshui, snow water, rivers and found no visible changes.

Lu Chunfang, director of the project's headquarters, said they have worked out administrative measures for protecting the local environment during the construction of the railway, aiming to keepthe effects on the local environment to a minimum.

In April, the Qinghai-Tibet railway construction headquarters and construction teams signed an agreement with Qinghai ProvincialEnvironmental Protection Bureau for each of the involved work units to take its due responsibility in protecting the local environment.

The agreement is said to be the first of its kind in the railway construction history of China.

The construction team in charge of building a large bridge at the source of the Yangtze River handles various kinds of garbage carefully. Degradable garbage is buried deep underground and that which is not degradable is disposed of at Golmud more than 400 km away. Effective measures have been taken to prevent soil erosion and polluting water sources during construction.

Use of phosphorus-free scouring is encouraged both in the residential camps and at the construction site. The waste water isdisposed of timely and then used for watering trees and grass.

 
   
 
   

 

         
         
       
        .contact us |.about us
  Copyright By chinadaily.com.cn. All rights reserved  
建水县| 商水县| 嫩江县| 台南县| 武川县| 秦皇岛市| 方城县| 商河县| 龙陵县| 佛学| 罗源县| 万载县| 宜阳县| 五莲县| 乐昌市| 贡嘎县| 固原市| 无极县| 正安县| 蒙阴县| 沁水县| 蓬溪县| 兰坪| 水富县| 阿城市| 那坡县| 中超| 遂溪县| 泊头市| 巴中市| 敖汉旗| 奉新县| 岑溪市| 化隆| 磐安县| 内江市| 光山县| 开化县| 故城县| 云南省| 南平市|