综合一区欧美国产,99国产麻豆免费精品,九九精品黄色录像,亚洲激情青青草,久久亚洲熟妇熟,中文字幕av在线播放,国产一区二区卡,九九久久国产精品,久久精品视频免费

Home|Contact|Members|中文|
Search
Home > Transmission and Distribution

Overseas Business

T&D Planning, Investigation, Design and Consultation

Updated: 2013-06-25

2) UHV converter station design

T&D Planning, Investigation, Design and Consultation

Areial view of±800-kV UHV Xiluodu (Shuanglong) converter station

T&D Planning, Investigation, Design and Consultation

±500-kV Deyang converter station, Sichuan province, put into operation in 2009.

3) UHV substation design

T&D Planning, Investigation, Design and Consultation

 

The Jindongnan- Nanyang- Jingmen 1,000-kV UHVAC transmission line is China's first transmission project of its kind, with a total length of 654 km and a 3.65-km span across the Yellow River and 2.96 km across the Hanjiang. It went into service in 2009 and won the National Quality Engineering Gold Medal the same year.

4) UHV substation design

T&D Planning, Investigation, Design and Consultation

The Xiangjiaba – Shanghai ±800-kV UHVDC transmission pilot project was China's first UHVDC transmission project and currently carries the highest DC voltage and is the most advanced DC transmission project in the world. The line is 1,891.6 km long and crosses the Yangtze River four times. It has a conversion capacity of 6,400 MW at 4,000 A DC. It went into operation in 2010 and won the National Quality Engineering Gold Medal for 2011.

Previous Page 1 2 Next Page

敖汉旗| 册亨县| 达孜县| 阳新县| 驻马店市| 富民县| 通海县| 梨树县| 龙山县| 张家界市| 绥芬河市| 鄂州市| 从化市| 射洪县| 汝城县| 湖北省| 瓦房店市| 平邑县| 石屏县| 麻栗坡县| 永州市| 莱芜市| 兰溪市| 伊春市| 禄劝| 汶川县| 高邮市| 龙口市| 鹤庆县| 安阳县| 香港 | 清河县| 泸州市| 迁安市| 合川市| 临沂市| 海安县| 荥经县| 泰来县| 卓资县| 文水县|