综合一区欧美国产,99国产麻豆免费精品,九九精品黄色录像,亚洲激情青青草,久久亚洲熟妇熟,中文字幕av在线播放,国产一区二区卡,九九久久国产精品,久久精品视频免费

Home|Contact|Members|中文|
Search
Home > Transmission and Distribution

Overseas Business

T&D Construction

Updated: 2020-09-09

POWERCHINA has done power transmission and transformation engineering work on various voltages -- 110 kV, 220 kV, 330 kV, 500 kV, 660 kV, 750 kV, 800 kV, 1,000 kV -- and has the equipment for power transmission and transformation engineering work at various voltages, as well as an international traction machine and tensioner.

By the end of 2014, it had completed work on 13,000 km of power transmission lines at or above 110 kV, and had 8,000 km of lines of 220 kV or higher, 5,000 km of lines at?or above 500 kV, and?750 km of?750 kV or higher. It had completed?six transformer substations and convertor stations at?750 kV or higher, 70 at?500 kV or higher, and 300 at?220 kV or higher

T&D Construction

Sichuan-Tibet Power Interconnection Engineering Project is the most difficult project in the construction of power transmission and transformer system, with a total length of over 1,500 kilometers. [Photo/POWERCHINA]

T&D Construction

The Belo Monte Power Transmission Project in Brazil is the first ±800 kV high voltage direct current electric transmission line in Latin America and the fourth of its kind in the world. [Photo/POWERCHINA]

大埔区| 盐城市| 吴江市| 加查县| 察雅县| 定远县| 宝兴县| 水城县| 建昌县| 博乐市| 班戈县| 昌邑市| 阿克陶县| 调兵山市| 兴海县| 内江市| 布尔津县| 日照市| 泾源县| 汪清县| 孝昌县| 葵青区| 高淳县| 双牌县| 杂多县| 巩留县| 龙里县| 吉隆县| 当雄县| 阳谷县| 涿州市| 攀枝花市| 宁津县| 克拉玛依市| 隆德县| 克东县| 张家港市| 德庆县| 鹤山市| 丽江市| 黑龙江省|