综合一区欧美国产,99国产麻豆免费精品,九九精品黄色录像,亚洲激情青青草,久久亚洲熟妇熟,中文字幕av在线播放,国产一区二区卡,九九久久国产精品,久久精品视频免费

Global EditionASIA 中文雙語Fran?ais
China
Home / China / Top News

Trans-Asian Railway construction on track

By YANG WANLI/LI YINGQING | China Daily | Updated: 2018-03-17 07:37
Share
Share - WeChat

Yunnan province will speed up construction of the Trans-Asian Railway within the province and aims to complete a railway network connecting China with Vietnam, Laos and Myanmar.

"Our goal is to build a modern railway network that could connect the provincial capital, Kunming, with the bordering nations in five hours and neighboring provinces within eight hours," said Wang Gengjie, general manager of China Railway Kunming Group Co.

Yunnan, in Southwest China, is the center of the Trans-Asian Railway, which is a project to create an integrated freight railway network across Europe and Asia.

As a deputy to the 13th National People's Congress, Wang revealed during the two sessions that all the construction work connecting China with Vietnam, Laos and Myanmar is speeding up and expected to be finished by 2021.

Under the current plan, the cross-border railway network will mainly serve freight trains for commercial trade, according to Wang.

The Kunming-Hekou Line connecting Yunnan's capital to the border with Vietnam now has two types of train tracks with different gauges.

The one-meter-wide single track, which matches the track size in Vietnam, has been used for decades and now serves freight trains.

In 2014, the bureau adopted new technology to successfully transform the track size into a wider one, and the one-meter-wide old track still can be used.

The wider track increased the train speed and cut the traveling time from Kunming to Hekou from 18 hours to only six.

"The cargo capacity improved from about 270 metric tons to nearly 4,000 tons with the technology. It has boosted economic development both at home and abroad," Wang said.

Construction of the China-Laos Line, the 414-kilometer railway linking Kunming and Vientiane, the capital of Laos, is underway and the line will begin operation by 2021, according to Wang.

Wang said the other two lines-the Dali-Lincang Railway and the Dali-Ruili Railway-aiming to connect with Myanmar and other Southeast Asian countries are also under construction.

In addition, construction of the two lines' shared part-the 200-kilometer-per-hour Guangtong-Dali railway-is expected to be completed in July this year, Wang said.

According to Wang, the designed operating speed of railways linking those three countries varies from 120 to 200 km/h.

Contact the writer at yangwanli@chinadaily.com.cn

Top
BACK TO THE TOP
English
Copyright 1994 - . All rights reserved. The content (including but not limited to text, photo, multimedia information, etc) published in this site belongs to China Daily Information Co (CDIC). Without written authorization from CDIC, such content shall not be republished or used in any form. Note: Browsers with 1024*768 or higher resolution are suggested for this site.
License for publishing multimedia online 0108263

Registration Number: 130349
FOLLOW US
 
长治市| 思南县| 淮阳县| 梅河口市| 新津县| 都江堰市| 晋城| 远安县| 长岛县| 兰考县| 金寨县| 韶关市| 贡山| 彭阳县| 米泉市| 梁平县| 绿春县| 章丘市| 福州市| 民丰县| 白玉县| 安庆市| 怀来县| 澄江县| 乌鲁木齐县| 峨山| 曲阜市| 大丰市| 屏山县| 富阳市| 海淀区| 利辛县| 四会市| 永福县| 双柏县| 台南市| 龙门县| 喜德县| 横峰县| 金平| 临武县|