综合一区欧美国产,99国产麻豆免费精品,九九精品黄色录像,亚洲激情青青草,久久亚洲熟妇熟,中文字幕av在线播放,国产一区二区卡,九九久久国产精品,久久精品视频免费

 

Home / Press/ News

Two contracts awarded to CEEC

Updated: 2014-03-14

On March 11, CEEC signed two contracts in South Asia.

Read more

 

CEEC's nuclear power project in Belarus started

Updated: 2014-03-07

The ground-breaking ceremony of the Belarusian nuclear outgoing transmission line & power interconnection project was held at aladzyechna, Minsk, Belarus, on March 3.

Read more

 

Ecuadorian Vice President witnesses opening of CGGC-built Highway

Updated: 2014-02-24

On February 17, the Guarumal-Mendez Highway, a joint venture between CGGC and the Ecuadorian company FOPECA, was opened to traffic.

Read more

 

Ecuadorian minister visits Paute-Sopra DORA Hydropower Station

Updated: 2014-02-12

Ecuador Minister of the Ministry of Electricity and Renewable Energy, paid an inspection tour to the Paute-Sopra DORA Hydropower Station.

Read more

 

Upper Trishuli Hydropower Station Phase-2 dam closed

Updated: 2014-02-12

February 8 witnessed discharge of water from the Phase-1 dam of the Upper Trishuli Hydropower Station in Nepal and closure of the Phase-2 dam.

Read more

 

Yang Yisheng met with Ecuadorian Vice President

Updated: 2014-01-24

Yang Yisheng, Party Secretary of CGGC International, met with Ecuadorian Vice President Jorge Glas in Beijing on January 23.

Read more

 

Malawian president cuts ribbon for Kapichira Hydropower Station Project

Updated: 2014-01-23

At Kapichira Hydropower Station, President Banda cut the ribbon to mark the beginning of power generation of Phase II Project.

Read more

 

Liouesso Hydropower Station Dam closes in the Republic of Congo

Updated: 2014-01-22

On January 16, the dam of Liouesso Hydropower Station, a project undertaken by CGGC in the Republic of Congo, was successfully closed, 60 days ahead of schedule.

Read more

 

Malawian Hydropower Station transferred

Updated: 2014-01-03

Malawian Kapichila Hydropower Station Project (Phase II) was successfully put into production.

Read more

 

Lao Prime Minister inspects Houay Lamphan Gnai Hydropower Station Project

Updated: 2014-01-03

On the morning of December 19, 2013, Thongsing Thammavong, Lao Prime Minister, inspected the Houay Lamphan Gnai Hydropower Station project undertaken by CGGC.

Read more

 


   2    >>|

 

Links Privacy Statement Terms of Use Contact Us

Copyright@2013 China Gezhouba (Group) Corporation. All rights reserved.

叙永县| 桦南县| 如皋市| 南丰县| 柳河县| 九台市| 长治县| 陆河县| 炎陵县| 许昌市| 垦利县| 平邑县| 女性| 汤阴县| 长阳| 当阳市| 垣曲县| 交口县| 新化县| 从化市| 镇雄县| 渝北区| 紫金县| 长葛市| 成武县| 二连浩特市| 台安县| 宁夏| 筠连县| 寻甸| 惠东县| 买车| 博爱县| 尼木县| 锡林浩特市| 昭觉县| 隆林| 延安市| 邵阳县| 新巴尔虎右旗| 揭东县|