综合一区欧美国产,99国产麻豆免费精品,九九精品黄色录像,亚洲激情青青草,久久亚洲熟妇熟,中文字幕av在线播放,国产一区二区卡,九九久久国产精品,久久精品视频免费

 

Home / Press/ News

Pakistan Jinnah Hydropower Station connects to the grid

Updated: 2013-10-12

On Oct 9 the CEEC-constructed Pakistan Jinnah Hydropower Station was connected to the power grid, with all of its eight generating units put into commercial operation.

Read more

 

Main work of the largest U-shaped water delivery project completed

Updated: 2013-10-07

On Sep 28, the No.54 section of Tuanhe Aqueduct of the middle line of the South-to-North Water Diversion Project, which is the world's largest U-shaped water delivery aqueduct that is undertaken by CGGC, was completed, 90 days ahead of the schedule.

Read more

 

CGGC wins the project of Wudongde spillway tunnel

Updated: 2013-10-07

On Sep 29, CGGC won the construction project of section I of the civil construction and installation of metal structure of the spillway tunnel of Wudongde Hydropower Station.

Read more

 

CGGC-undertaken Blue Mountain Tunnel Project wins praise

Updated: 2013-09-26

On Sep 16, Raphael Boveda Bonia, the minister of the Strategic Coordination Ministry, and Walt Solis, the minister of the Ministry of Resources, inspected the Blue Mountain Tunnel Renovation Project untaken by CGGC.

Read more

 

CEEC wins Nepal Zhongbaitaike Hydropower Station EPC contract

Updated: 2013-09-23

On Sep 20 CEEC was awarded the EPC contract for civil engineering and metal structure of Nepal Zhongbaitaike Hydropower Station, with a contract value of $90.78 million.

Read more

 

Boiler installation starts for largest Iraqi Oil/Gas Fired Power Plant

Updated: 2013-09-17

On Sep 15 Baghdad time, the first steel structure of No.1 boiler of the Salah Al-Din 2*630 MW Oil/Gas Fired Power Plant was successfully hoisted and positioned in place.

Read more

 

CEEC hands over 181 low-income settlement houses in Angola

Updated: 2013-09-12

181 low-income settlement houses in Malanju province were completed by CEEC and handed over to the owner on Sep 9 after passing acceptance inspection.

Read more

 

Parit Baru Coal Fired Power Plant construction commences

Updated: 2013-09-07

A groundbreaking ceremony was held on Sep 5 in Bengkayang district, West Kalimantan province, Indonesia, to celebrate the commencement of construction of Parit Baru Coal Fired Power Plant.

Read more

 

No.3 generator unit of Vietnam Haiphong Power Plant connects to the grid

Updated: 2013-09-05

On Aug 30, the CEEC-designed No.3 generator unit of Phase-2 project of Vietnam Haiphong Power Plant was put into operation and connected to the grid.

Read more

 

CEEC begins to repair Dunai Dam in Angola

Updated: 2013-09-05

Aug 28 saw the commencement of CEEC-contracted repair of the Dunai River Dam in Benguela province, Angola.

Read more

 


   5    >>|

 

Links Privacy Statement Terms of Use Contact Us

Copyright@2013 China Gezhouba (Group) Corporation. All rights reserved.

阿勒泰市| 盐源县| 胶南市| 广州市| 南溪县| 淳化县| 芦山县| 沙田区| 胶州市| 民和| 伊春市| 洮南市| 临泉县| 揭西县| 河南省| 稻城县| 巴楚县| 祁阳县| 黎平县| 务川| 贺州市| 巩留县| 闸北区| 衡东县| 噶尔县| 定边县| 拜泉县| 四平市| 九龙城区| 舟曲县| 西安市| 偏关县| 潼南县| 响水县| 远安县| 鲁甸县| 贵阳市| 城口县| 沐川县| 崇明县| 高台县|