综合一区欧美国产,99国产麻豆免费精品,九九精品黄色录像,亚洲激情青青草,久久亚洲熟妇熟,中文字幕av在线播放,国产一区二区卡,九九久久国产精品,久久精品视频免费

Home|Contact|Members|中文|
Search
Home > News

Cambodian Prime Minister Attends Kirirom Station's Ceremony

Updated: 2013-03-01

The?Kirirom III No.3 Hydropower Station, located in the KOH Kong Province of Cambodia, was recently put into operation. The ribbon cutting ceremony of the Project was held on February 23, 2013 in the power station area. The Project was investigated and designed by HYDROCHINA Mid-South Engineering Corporation (MSDI), a subsidiary of POWERCHINA, and financed by State Grid of China.

Hun Sen, Cambodian Prime Minister, Pan Guangxue, Chinese ambassador to Cambodia, and Pan Xiaojun, Representative from State Grid attended the ceremony and cut the ribbon of completion of construction work of the Project. Hun Sen addressed the gathering and pointing out that the safe and reliable operation of the hydropower station will effectively mitigate the power shortage in Cambodia.

Kirirom?hydropower station is 160km to the capital Phnom Penh. The total installed capacity of the project is 18MW. The construction work of the power station started in March, 2009, and the project was commissioned in April 2012, and put into commercial operation in Sept 2012. By the end of 2012, the hydropower station had generated 80GWh of energy.

The Kirirom III hydropower station is one of the six hydropower projects constructed by Chinese companies on BOT basis. The other 5 projects are Kirirom I Hydropower station, Keng Kang hydropower station, Elesai hydropower station, Wodai hydropower station and Da Dai Hydropower Station. After completion, the 6 projects will have a combined annual output of 928MW for Cambodia.

Cambodian Prime Minister Attends Kirirom Station's Ceremony
Hun Sen, Kampuchea's Prime Minister Addresses the Ceremony

 

庆安县| 霍州市| 宁蒗| 旬阳县| 红原县| 大安市| 怀远县| 慈利县| 上林县| 寻甸| 绥宁县| 龙游县| 湘阴县| 子洲县| 额敏县| 嘉峪关市| 包头市| 视频| 梓潼县| 黔南| 临湘市| 武宣县| 资中县| 双鸭山市| 淄博市| 威海市| 彩票| 连江县| 剑阁县| 贵阳市| 淮阳县| 利川市| 砚山县| 剑河县| 正宁县| 阳西县| 孟村| 天等县| 乐亭县| 上杭县| 嘉鱼县|